Blenheim Grove video 15 – Railings & brick slips
In this progress video, the railings & brick slips have been installed at Blenheim Grove.
In this progress video, the railings & brick slips have been installed at Blenheim Grove.
An exciting day as we got planning permission to separate House 62 into two apartments
The tiles went down in the courtyards at Blenheim Grove in this video update.
Our triple glazed Velux windows were installed at Blenheim Grove, insulating the house from both weather and noise.
Our Blenheim Grove houses have gone up to roof level and we’ve built the sloping roofs for the stair core.
Our exterior walls have gone up in this video! Get a look the wall ties, joints, and plumb lines.
Get a first look at the interior of our shell homes at Blenheim Grove.
The houses are getting up to roof level and we’re very excited about this milestone.
Our houses are built with timber frames, see how they fit in on site at Blenheim Grove.
The foundation and engineering bricks are being installed, ready for the rest of the house to be built.